
Category
Electrical
Status
Delivered
Coverage Area
Wide Presence
Timeline
1 – 2 Months
— Project Detail
Electrical Power Distribution
- Security system cctv cameras access points
- Fire alarm system using (FM200)
- Linier technology system
- EMT & PVC Conduit Installation for Power Outlet & Data Outlet
- Cable Pulling and Termination for Power Outlet & Data Outlet
- Installation of Cable Tray
- Cable Pulling AC and DC Cable
- Cable Labelling Cable Dressing and Cable Testing
- Cable termination Testing and Commission
- Cable Trey Installation
— Technology
Technologies and Tools We Use
- CCTV & Access Control
IP Cameras, NVRs, Access Points, PoE Switches - Fire Suppression System (FM-200)
Alarm panels, gas suppression units, safety compliance - Cable Infrastructure & Termination
EMT & PVC conduits, AC/DC cable pulling, labeling & testing - Cable Tray & Panel Board Installation
Cable trays, MDB, ATS, EMDB, Panel boards - Tools & Software
Fluke testers, crimpers, AutoCAD, ETAP, Excel - Top Brands Used
ABB, Schneider, Honeywell, Bosch, Cisco



